YUK STANSIYASIDAN SHAXOBCHA YO‘LLARGA VAGONLARNI BERISH VA QAYTARIB OLISH JARAYONINI OPTIMALLASHTIRISH

Authors

  • Tojiboyev Jahongir Baxodir o‘g‘li Author

Keywords:

Kalit so‘zlar: yuk stansiyasi, shaxobcha yo’llari, vagonlarni berish, vagonlarni qaytarib olish, manevr ishlari, vagon oqimi, yuk fronti, vagon-soat, optimallashtirish, matematik model, logistika, temir yo‘l transporti.

Abstract

Annotatsiya. Temir yo‘l transportida yuk stansiyasi bilan korxonalarning umumiy foydalanishdagi bo‘lmagan temir yo‘l yo‘llari — shaxobcha yo’llari o‘rtasidagi o‘zaro texnologik bog‘liqlik yuk tashish jarayonining muhim tarkibiy qismi hisoblanadi. Mazkur jarayonda vagonlarni yuklash-tushirish punktlariga o‘z vaqtida yetkazib berish, yuk operatsiyalari tugagandan keyin vagonlarni qaytarib olish, manevr lokomotivlaridan samarali foydalanish va stansiyadagi vagonlarning bekor turishini kamaytirish asosiy masalalardan biridir. Ushbu maqolada vagonlarni shaxobcha yo‘llarga berish va qaytarib olish masalasi bo‘yicha ilgari bajarilgan ilmiy tadqiqotlar tizimli ravishda tahlil qilinadi. Xususan, shaxobcha yo’llarilarda shunting operatsiyalarini kombinator optimallashtirish, hybrid shaxobcha yo’li network sharoitida vagonlarni bir vaqtning o‘zida berish va olib chiqish, manevr operatsiyalarining vaqt me’yorlarini hisoblash, Yuk maydonlarilarda optimallashtirish, vagon oqimlarini boshqarish va railway shaxobcha yo’li quvvatini oshirishga qaratilgan yondashuvlar taqqoslanadi.

References

1. Li, B.; Yun, C.; Xu, G.; Zhou, X.; Xuan, H. Optimization of Simultaneous Delivery and Pickup Wagon Scheme on Hybrid Shaxobcha yo’li Network of Railway Terminal. Discrete Dynamics in Nature and Society, 2022, Article 6713617, 17 p.

2. Baqoyev, A.; Yusupov, A.; Khudayberganov, S.; Sarsembekov, B.; Khusenov, U.; Svetashev, A.; Kayumov, S.; Akhmedova, M.; Tokhtakhodjayeva, M. Combinatorial Optimization of Shunting Operations for Shaxobcha yo’llaris Adjacent to Railway Stations. Vehicles, 2026, 8(5), 107.

3. Kozachenko, D. M.; Verlan, A. I.; Korobiova, R. H. Development of Analytical Methods for Calculating Time Standards for Shunting Operations. Science and Transport Progress, 2021. DOI: 10.15802/stp2021/228097.

4. Deleplanque, S.; Pellegrini, P.; Rodriguez, J. Train management in freight shunting yards: Formalisation and literature review. IET Intelligent Transport Systems, 2022, 16(10), 1286–1305.

5. Bohlin, M.; Gestrelius, S.; Dahms, F.; Mihalák, M.; Flier, H. Optimization Methods for Multistage Freight Train Formation. Transportation Science, 2015, 50(3), 823–840.

6. Haahr, J. T. Reactive Robustness and Integrated Approaches for Railway Optimization Problems. PhD Thesis, Technical University of Denmark.

7. Deleplanque, S.; Pellegrini, P.; Rodriguez, J. Optimization of a temir yo’l maydonlari in real time. EURO 2018.

8. Sánchez Martín, C. Automated Shunting in Rail Yuk maydonlaris. Master Thesis, Technische Universität Berlin, 2019.

9. Kozachenko, D. M.; Klyga, O. V.; Kharchenko, Ye. V. Modeling of Train Sets in Tasks of Railway Stations Technical and Operational Evaluation. Science and Transport Progress, 2025.

10. Optimization of Railway Freight Shunting. Handbook of Optimization in the Railway Industry, 2018.

Published

2026-10-06

How to Cite

Tojiboyev Jahongir Baxodir o‘g‘li. (2026). YUK STANSIYASIDAN SHAXOBCHA YO‘LLARGA VAGONLARNI BERISH VA QAYTARIB OLISH JARAYONINI OPTIMALLASHTIRISH. Ta’lim Innovatsiyasi Va Integratsiyasi, 78(1), 178-192. https://modernedu-dv.org/index.php/tal/article/view/594